 |
Coddling the Nuclear Weapons Complex
Christopher Paine
At the National Nuclear Security Administration (NNSA), it is as if
the Cold War never ended. Despite the reduced likelihood of a major
nuclear conflict, massive cuts in the deployed U.S. arsenal, and a
long-standing moratorium on U.S. nuclear testing, the budget of the
Department of Energys nuclear weapons agency has steadily grown
during the last decade. The Energy Department now spends 35 percent
more on the U.S. nuclear arsenal each year than it did on average
during the standoff with the U.S.S.R. between 1948 and 1991 (when
it spent the equivalent of $4.2 billion annually in current dollars).
In addition, if the White House prevails with its fiscal year 2005
budget request and stays on the track outlined in its Five-Year
Nuclear Security Program, the growth in spending for nuclear
weapons will continue without respite.
In fact, if President George W. Bushs request of $6.6 billion
is approved, U.S. spending on weapons activitiesnuclear
weapons research, development, testing, and production, as well as
administration of the nuclear weapons stockpilewill have virtually
doubled over the past decade. If the administration has its way, the
trend is not about to end. The NNSA has told Congress that it plans
to increase spending on the U.S. arsenal to $7.76 billion by 2009.
Indulging the Weaponeers
U.S. nuclear spending has soared since a 1995 decision to adopt a
complex, simulation-based virtual testingvirtual prototyping
strategy as the paradigm for stewardship of the U.S. nuclear
stockpile. Since then, the Energy Department has spent tens of billions
of dollars on new and upgraded experimental facilities, computers,
networks, code development, and computer-controlled production equipment.
It remains largely unable to implement this grandiose and technologically
aggressive strategy, however, as key experimental capabilities remain
unfinished, mired in technical difficulties and huge cost overruns.
The intellectual premise behind this massive expenditure was that
absent nuclear test explosions, confidence in the performance of new
or modified nuclear weapons could only be gained from building costly
new experimental facilities to generate data that would inform three-dimensional
computer simulations of the entire nuclear explosion sequence, beginning
with the detonation of chemical explosive and ending with the combined
thermonuclear burn and fissioning of the weapons secondary stage.
Moreover, DOE officials insisted that these simulations could be relied
upon to predict the performance of stockpiled war reserve
weapons only if they had first been validated by successfully
predicting the results of similarly complex integrated experiments
conducted in the new science-based stockpile stewardship
facilities. Examples of such code-validating tests include inertial
fusion capsule gain experiments and primary stage implosions, diagnosed
with highly-penetrating, three-dimensional, time-resolved radiographic
imaging.
Critics at the time charged that the entire virtual testing
strategy was needlessly complex and costly for the relatively simple
task at hand: sustaining confidence in the safety and reliability
of a modest but sufficient, enduring stockpile of nuclear weapons,
for as long as needed. Detailed studies also noted that the large
unclassified research component of the effort to model fundamental
physical processes involved in generating nuclear explosions could
well exacerbate proliferation of nuclear weapons knowledge.[1]
Subsequent events have proven many of these criticisms well founded.
Indeed, because of technical flaws and delays in its more ambitious
efforts, the NNSA is slowly reverting to an alternative method put
forward a decade ago by its critics: engineering-based
stewardship. This approach seeks to assure the ability to produce
and replace non-nuclear components and subsystems that can be thoroughly
tested while attempting to minimize changes to primary- and secondary-stage
nuclear components that cannot be tested to nearly the same extent.
In this more conservative approach, confidence in the performance
of these nuclear explosive components is maintained, not through elaborate
computer simulations of uncertain fidelity but through careful engineering
efforts that ensure maintenance and remanufacture of weapons at current
(or improved) quality levels.
These efforts rely on tried and true techniques for ascertaining that
the primarys high-explosive driven plutonium shell continues
to hit the performance benchmarks required for the onset of nuclear
fission and subsequent ignition of fusion reactions in heavy-hydrogen
boost gas, which is confined and heated within the imploding
core. The flood of extra neutrons released by fusion boosts
fission of the plutonium to a level that ensures a superabundance
of radiation for imploding and igniting the secondary stage, which
typically accounts for the vast bulk of the total energy released
in a large nuclear explosion. Very little uncertainty attends the
detonation of a proven secondary design in the presence of a minimally
adequate primary yield, so under a prolonged test moratorium the major
uncertainties tend to focus on the continued performance of the primary
stage.
As for sustaining the ability to forecast the ultimate force of an
explosion with high confidence, the strict nuclear explosive performance
criteria used in the Cold War are no longer as relevant as they once
were. Even for those who subscribed to the oddly detached moral psychology
and doctrines of nuclear war-fighting deterrence, worry about how
unexpected degradations in nuclear explosive yield (unreliability)
might affect kill probabilities against hardened counterforce
targets, such as missile silos and command centers, no longer seems
to be of vital importance. Even the Pentagons own Defense Science
Board has come round to the view that there is no need to rebuild
large numbers of high yield legacy nuclear weapons to
support a credible and effective deterrence policy.[2]
For post-Cold War deterrence, it matters little (except perhaps to
the population of the targeted nation) whether or not a nuclear weapon
detonates at its full thermonuclear yield (typically tens to hundreds
of kilotons of TNT equivalent). Even if the secondary stage fails
to ignite, the weapon would still achieve yields in the low kiloton
range, sufficient to deter nuclear use by rogue states.
All this means that using computer simulations to guarantee that a
nuclear blast will reliably yield the greatest possible explosive
power is no longer vital for deterrence. Moreover, the vast improvements
in guidance technology provided by global positioning system-aided
systems can be expected to make up for losses in lethality against
most targets from less-than-expected yields. The only exception might
be when striking very deeply buried targets, which can only be destroyed
by weapons with yields of several hundred kilotons or more. Yet, using
such a high-fallout weapon against a non-nuclear-power would be both
monstrous and implausible. And its use against a nuclear-weapon state
such as Russia or China would be indistinguishable from all-out nuclear
warfare, and thus confers no deterrent advantages.
Costly Campaigns
Given the reduced relevance of large-scale nuclear capabilities to
countering todays U.S. security challengesit is inexcusable
that more has not been done to reduce the scale of the size and scale
of the nuclear complex. On the contrary, Bushs budget calls
for a series of so-called campaigns bent on resurrecting a modern,
highly automated, and networked version of the old Cold War nuclear
weapons complex. These plans would cost $1.9 billion in fiscal year
2005 and more than $12 billion over the next five years. That is nearly
50 percent more than the Energy Department will spend on the nuts-and-bolts
costs of the U.S. arsenal: the warhead development, refurbishment,
and stockpile maintenance tasks that have been agreed upon with the
Department of Defense.
A look inside these various NNSA campaigns reveals an
astonishing world of unaccountable spending, gross mismanagement,
and technological excess by a laboratory elite that confuses its own
narrow weapons science interests with those of the nation
and its taxpayers.
Science Campaign
At the base of the stewardship pyramid one finds the so-called Science
Campaign, which is really a wide array of applied science and technology
projects to improve U.S. capabilities for predicting the performance
of nuclear weapons. This account funds such items as improving Nevada
Test Site (NTS) readiness to resume underground nuclear test explosions
($30 million in fiscal year 2005) and reviving Lawrence Livermore
National Laboratorys (LLNL) Atomic Vapor Laser Isotope Separation
(AVLIS) pilot plant, which was mothballed at the close of the Cold
War. The pilot plant will likely separate additional supplies of a
highly prized plutonium isotope, Pu-242, which can be used to test
the behavior of a bombs core of plutonium and high explosive
at full scale without producing an explosive nuclear chain reaction.
These hydrodynamic tests, so named because the compressed
material behaves like a moving fluid, are a key tool of stockpile
stewardship.
A major preoccupation of the Science Campaign in fiscal years 2005
and 2006 will be fixing the Los Alamos National Laboratorys
(LANL) Dual Axis Radiographic Hydrotest (DARHT) facility, arguably
the most technically important facility in the science-based stockpile
stewardship program. The facility is designed to provide rapid, high-resolution
x-ray photographs simultaneously along two axes. Weapons scientists
want to use this detailed three-dimensional imagery of surrogate primary-stage
explosions as a benchmark to ensure the accuracy of computer simulations
of the implosion process in the absence of nuclear testing.
DARHT began life in the fiscal year 1988 budget request as a modest
$30 million upgrade of the existing single-axis x-ray capability to
a dual axis machine. Sixteen years later, DARHT is still not finished,
but now it costs $327 million, according to the Energy Departments
inspector general, who predicted in May 2003 that the facility would
not be fully operational until June 2004.[3]
As the fiscal year 2005 budget request makes clear, even this recent
assessment is obsolete: deep within the document, the NNSA reported
that the high-tech second axis is suffering from high voltage
breakdown and that the first 2-axis shot in support of
stockpile assessment would not be conducted until fiscal year
2007. That would be 19 years after the projects inceptiona
project that the Energy Department claimed was absolutely critical
to the success of its stockpile stewardship strategy.
Engineering Campaign
While Science Campaign projects mainly flow to the two nuclear design
laboratories, the Engineering Campaign element is largely within the
purview of Sandia National Laboratory, managed for the NNSA by Lockheed
Martin, the nations largest defense contractor. Sandia is tasked
with conducting non-nuclear component engineering and weapons system
integration of the nuclear components developed by LANL and LLNL.
The centerpiece of Sandias engineering campaign is the $519
million Microsystems and Engineering Sciences Application (MESA) Complex
in Albuquerque.
Its purpose is to develop new microelectronic machine (microsystem)
components to meet a postulated need for continual advances
in technologies to improve nuclear weapon surety
(i.e., built-in technical features that ensure against both unauthorized
and accidental detonations). The complex will also endeavor to produce
modern, highly integrated miniaturized replacement parts for the larger
number of discrete non-nuclear components currently used in nuclear
weapons, to meet the needs of the NNSAs large refurbishment
programs for enduring stockpile warheads.
All in all, the MESA complex will comprise approximately 391,000 square
feet and house some 650 engineers working on new microcomponents for
nuclear weapons. How much of this is minimally necessary in order
to extend the service life of existing weapons and how much is self-serving
empire building by Sandia and corporate parent Lockheed Martin is
difficult for outside observers to gauge. We do know, however, that,
until two years ago, this project consisted only of a proposed $51
million upgrade for retooling the existing Microelectronics Development
Laboratory. One may therefore surmise that some of the recent additional
work, such as the new Weapons Integration Facility with state-of-the-art
visualization facilities for designing new weapon components,
is a gold-plated pork barrel add-on that is not strictly required
to sustain the nuclear weapons stockpile.[4]
Advanced Simulation and Computing Initiative (ASCI) Campaign
In the NNSAs fiscal year 2005 request, the Bush administration
reveals that it intends to spend $740 million next year on nuclear
weapons simulation and computing and an astonishing $4.03 billion
through fiscal year 2009an average of $806 million per year
just on nuclear weapons computing alone. Each of the nuclear weapons
laboratories now has a new supercomputing center under construction
or recently completed. The NNSA is nearing completion of a program
to equip them with the second generation of ASCI supercomputing systems.[5]
From the inception of the ASCI program in fiscal year 1996 through
fiscal year 2004, the Energy Department spent at least $4.75 billion
on nuclear weapons computing. This sum does not include all the costs
involved in setting up and gathering data from experiments designed
to refine the physics models embedded in the various linked modules
of code that attempt to simulate each stage of the implosion-explosion
process. From fiscal year 2005 to fiscal year 2009, the NNSA plans
to spend another $4 billion on further ASCI hardware and software
development, for a total of $8.75 billion, or an average of $2.92
billion to equip each weapons laboratory with state of the art
simulation capabilities.
In an era when the network is the computer, apparently
no one in government (save perhaps the General Accounting Office [GAO])
thought to ask why the NNSA weapons labs could not make do with networked
access to a single center for massively parallel computing,
rather than constructing and equipping three such centers, particularly
in view of the GAOs repeated findings in the late 1990s that
the Energy Departments existing supercomputer resources were
seriously underutilized: In 1997, for example, less than 5%
of the jobs run on the largest supercomputers used more than one-half
of the machines capabilities.[6]
Inertial Confinement Fusion and High-Yield Campaign
After ASCI, the second-largest NNSA campaign in Bushs
request in terms of funding ($492 million) is the Inertial Confinement
Fusion and High-Yield Campaign. It is slated to account for total
spending of $2.43 billion over the course of the NNSAs projected
Five-Year National Security Plan. Most of this planned
funding is directed toward the National Ignition Facility (NIF), a
massive, 196-beam laser facility under construction at LLNL. The funds
will be used both to complete the facility and to achieve the technical
readiness to begin NIF fusion ignition experiments. NIF is by far
the largest single project in the NNSA budget and, quite possibly,
the most expensive experimental facility ever built.
According to the NNSA, when laser system installation is finally completed
in September 2008, construction of NIF will have officially
cost $3.5 billion. The Natural Resources Defense Council (NRDC) estimates
that the total actual cost of the project through fiscal year 2008,
including ignition target research and development (R&D), production,
and diagnostics, will actually be much higher, on the order of $5.2
billion, and further hundreds of millions if not billions of dollars
will be required to reach the first demonstration of the
facilitys namesake mission, fusion ignition, now variously postponed
until 2010-2014.
Recall that a driving rationale for the NIF was the ostensibly critical
need to have an ignition facility capable of propagating
fusion burn and modest energy gain in place by last year in
order to help validate the three-dimensional computer
codes under development in the ASCI program. In initially pointing
to the 2003 date, the Energy Department had said that by last year
most of the weapons in the stockpile will be in transition from
their designed field life to beyond field life design and the
number of designers with test experience will be reduced by about
50 percent.
Readiness Campaign
The NNSA says its Readiness Campaign is intended to revitalize
the nuclear weapons manufacturing infrastructure by improving
both its responsiveness and its technology base.
Claiming marching orders from the Bush administrations December
2001 Nuclear Posture Review, the NNSA claims that a truly responsive
infrastructure is the cornerstone of the new nuclear defense triad
outlined in this document. To be considered a credible deterrent,
this infrastructure must include a manufacturing capability with state-of-the-art
equipment combined with cutting-edge applications of technology, and
an ability to quickly provide modified or enhanced capabilities and
products to meet emerging threats.[7]
In fiscal years 2005-2009, the readiness program consists of five
subprograms with a projected price tag of $1.65 billion. These include
thermonuclear component (secondary) manufacturing, high-explosives
production and weapons assembly/disassembly, electronic and mechanical
components, new computerized production technologies, and readiness
to produce tritium for stockpile weapons. Some of this work is necessary
for maintaining a nuclear deterrent stockpile, but much of it is not.
Apart from its evident self-serving qualities, there are some logical
flaws to the NNSAs new deterrent construct. To be credible,
nuclear weapons need not be produced with state-of-the-art equipment
or cutting edge technology. Indeed, Bush professes to
have invaded Iraq to forestall development of what clearly would have
been a crudely produced nuclear explosive device, the threat of which
he nonetheless found to be credible. Further, one is hard pressed
to see how, absent far-reaching changes in the global security environment,
the existence of modern production infrastructure per se, rather than
actual weapons and forces, would be considered a deterrent to armed
attack upon the United States or its allies and friends. If this were
true, the administration should have no objection to eliminating the
entire U.S. nuclear arsenal and relying on its fearsome industrial
capability to reconstitute the arsenal to discourage cheating on a
global nuclear disarmament regime.
The NNSA seems to be positing a novel extension or reinvention of
the concept of deterrence, one that is more accurately described as
dissuading or discouraging potential rivals
for global preeminence from even seeking to acquire nuclear-weapon
capabilities commensurate with those of the United States. This approach
has nothing to do with classic deterrence of nuclear attack through
an assured survivable capability for nuclear retaliation, nor even
with extended deterrence of conventional conflict through
calibrated, not incredible threats to use nuclear weapons
first. On the contrary, it is a self-serving argument to justify continued
work for defense bureaucracies and their contractors.
One particularly wasteful aspect of the Energy Departments Readiness
Campaign has been the expenditure of at least $2.6 billion since 1996
in maintaining and attempting to restore U.S. tritium recycling, production,
and extraction capabilities.[8]
The Energy Department has spent this huge sum even though U.S. tritium
requirements have been declining steadily with continuing reductions
in the requirement for active stockpile weapons and no
fresh tritium was required or produced to support the stockpile throughout
this period. The recent spending has been premised on restoring a
capability to support the Pentagons declared START II stockpile
tritium requirement (i.e., 4,900 active nuclear weapons
with filled tritium reservoirs plus a five-year reserve
to surge deployment of additional weapons or replenish
these reservoirs in the event production were disrupted for a prolonged
period). The NRDC estimates that this artificially inflated requirement
could be met from existing tritium supplies until 2007, at which time
the reserve would dip below its required five-year support
level. So, the lack of fresh tritium supplies would not begin to affect
the ability to deploy actual weapons until 2012.
Suffice to say, after the force reduction envisioned in the 2002 Strategic
Offensive Reductions Treaty (SORT), this tritium requirement scenario
is now outdated, but it has yet to be formally replaced with another,
more realistic one. Supporting the reduced but still large nuclear
force levels called for under SORT, for example, 1,700 operationally
deployed strategic weapons and 300 operationally deployable
nonstrategic weapons with a five-year tritium reserve, would not require
resumption of tritium production to prevent a decline in the reserve
until around 2012; actual weapons would not need fresh tritium until
2017. Clearly, the Bush administration and the Congress have a lot
of flexibility and additional time to determine both required
operational nuclear force levels and when or, indeed, whether to resume
tritium production.
They should use this time to reconsider the administrations
tritium plans. They could begin with the need for a five-year tritium
reserve. The existing requirement makes no economic sense for a costly
decaying asset such as tritium. Moreover, the president has the inherent
authority under the Atomic Energy Act to direct production of tritium
in any one of 100 civilians reactors in the (unlikely) event of a
genuine national security emergency. So, shifting to a
shorter two-year reserve makes more sense and would further extend
until 2015 the point at which new tritium production might be needed.
Additionally, if the United States and Russia were to make further
cuts, say, to a level of 1,000 deployed nuclear warheads each, such
a U.S. force could be maintained with a two-year reserve until around
2022 without producing additional tritium.
Additionally, the NNSAs plans to satisfy future tritium requirements,
largely inherited from the previous administration, are fraught with
inefficiency, bad management, and a continuing failure to consolidate
tritium R&D operations. The NRDC estimates that the tritium capabilities
spending outlined in the administrations budget projections
for fiscal years 2005-2009 totals at least $1.2 billion.
Rather than consolidating or eliminating sites where tritium R&D
activities are conducted, in which each site requires their own (decaying)
minimum inventories of tritium and carries high fixed-overhead costs
for security and environment, safety, and health, the Energy Department
has continued under President Bill Clinton as well as President George
W. Bush to sustain tritium operations at both LANL and LLNL as well
as at SRS. Indeed, the Bush administrations particular contribution
is to reinvigorate the tritium R&D facility (B331) within LLNLs
Superblock Complex. Successive administrations have allowed
the Energy Department to maintain tritium, plutonium, and radiographic
hydrotest facilities in triplicate at LLNL, LANL, and NTS, as though
the nuclear arms race with the former Soviet Union had never ended.
Pit Manufacturing and Certification Campaign
This weapons complex campaign, ongoing since fiscal year
1993, has the immediate goal of restoring [at LANL] some limited
capacity to manufacture pits of all types that was lost in 1989
when the main Cold War pit manufacturing plant, located at Rocky Flats
northwest of Denver, imploded in a multibillion dollar debacle of
contamination, criminality, and managerial incompetence.[9]
The longer-range NNSA objective is the design and construction of
a $2-4 billion Modern Pit Facility (MPF) to support long-term pit
manufacturing beginning late in the next decade. This comes even as
LANL is well along in a $2.3 billion, decade-long modernization of
its pit fabrication and plutonium chemistry complex, which is scheduled
to reach a capacity for producing 20 pits a year by 2007. (Another
article in this issue looks in detail at the debate surrounding the
need for the Modern Pit Facility. See page 10).
Quite apart from the MPF, however, the administrations five-year
national security plan calls for spending $1.3 billion on pit manufacturing
and certification from fiscal year 2005 to fiscal year 2009, on top
of the $1.2 billion already expended during fiscal years 1998-2004.
It is something of a mystery how so little capability could have resulted
from the huge amount already expended.
In the next budget year, the NNSA intends to manufacture at
least six certifiable W88 pits to augment the six being produced
this year, with the goal of having these certified for use by 2007
as replacement pits for the 450-kiloton thermonuclear warheads for
the Trident II submarine-launched missile. Manufacture of these six
certifiable pits, not including the cost of the plutonium
itself, will cost $132 million in the next fiscal year, or $22 million
per pit, which amounts, at current prices, to roughly 480 times the
value of the pits weight in gold.[10]
By comparison, the Manhattan Project produced the first significant
quantities of separated plutonium in human history and manufactured
it into pits within three years. Now, we are supposed to believe that
a half century of experience later, and tens of thousands of pits
later, that LANL legitimately requires 11 years and more than $2.5
billion to confidently manufacture and certify one war reserve
pit for the nuclear weapons stockpile?
Recommendations
Given the many problems with the NNSAs approach to the stockpile
stewardship program, Congress needs to take action. It should defer
consideration of any new facility or weapons refurbishment request
until the administration has submitted and Congress has examined,
debated, and approved the essential contours of a plan to reduce the
nuclear weapons stockpile to levels that make sense for the post-Cold
War world. Congress needs to cease ducking the nuclear weapons issue
and have the debate, examining what can and should be changed. There
are potentially billions of dollars in annual savings to be had from
shifting to a far more compact, less alert, and less deployed nuclear
force, supported by a smaller and more sustainable nuclear complex.
This money could be used to reduce the federal budget deficit or improve
U.S. national security by substantially increasing the $500 million
annually NNSA spends on nonproliferation initiatives in Russia and
other foreign countries.
Once Congress has approved a revised nuclear stockpile plan, it must
determine how to rationalize and consolidate the NNSA complex to eliminate
Cold War redundancies, reduce its environmental footprint, and reduce
the security and safeguards overhead burden, which is growing rapidly.
A key element will be to streamline and simplify the current, needlessly
complex virtual testing paradigm for stockpile stewardship.
After a decade, the current program has not built the kind of disciplined
and conservative protocols that would permit indefinite, confident
retention of a nuclear weapons stockpile at minimum cost.
The NNSA and its laboratories have mystified the basic tasks of sensible
stockpile stewardship in ways that are beyond the bounds of fiscal
sanity and reason. Far from boosting confidence, the current program
is actually structured to function as a constant wellspring of uncertainty,
thereby fostering continuing costly requirements and milestones
for ever more elaborate experimental and computational facilities.
Of course, the need to resolve the accumulated conflicts and inconsistencies
in the data generated by numerous scaled experiments and weapons computations
could just as easily lay the groundwork for what will appear to be
an earnest case for a limited return to nuclear explosive
testing to resolve the uncertainties and calibrate
the codes.
Indeed, the notion at the heart of the current bloated stewardship
effortthat the United States must continually expand its nuclear
weapons knowledge and capability while threatening or attacking others
whom we suspect of doing the same thing is an Orwellian mismatch
with US nonproliferation objectives. The Administrations errant
initiatives to increase readiness to resume nuclear test explosions,
build a large Modern Pit Facility, and modernize thousands of Cold
War legacy weaponsincluding conversion of high-yield strategic
bombs to robust nuclear earth penetratorsall share
the distinction of being both wasteful and politically destabilizing.
Congress should decline funding for these efforts while taking meaningful
steps to restructure and reduce the nuclear weapons complex.
NOTES
1. See Christopher E. Paine, A Case Against
Virtual Nuclear Testing, Scientific American 281, no.
3 (September 1999): 64; Christopher E. Paine and Matthew G. McKinzie,
Does the U.S. Science-Based Stockpile Stewardship Program Pose
a Proliferation Threat? Science and Global Security,
vol. 7 (1998): 151-193; Matthew G. McKinzie, Thomas B. Cochran, and
Christopher E. Paine, Explosive Alliances: Nuclear Weapons Simulation
Research at American Universities, Natural Resource Defense
Council (NRDC) Nuclear Program, Washington, DC, January 1998.
2. The nuclear weapons program as currently
conceiveda program focused primarily on refurbishing the legacy
stockpilewill not meet the countrys future needs.
Defense Science Board, Report of the Defense Science Board Task
Force on Future Strategic Strike Forces, Washington, DC, February
2004, pp. 1-10.
3. Office of Audit Services, Office of Inspector
General, U.S. Department of Energy, Audit Report: Dual Axis
Radiographic Hydrodynamic Test Facility, DOE/IG-0599, May 2003,
p. 4. The report cites an official total project cost
of $270 million, plus $57.5 million in additional costs associated
with work elements transferred outside of the project. But NRDC
estimates that the final cost of the fully commissioned DARHT facility
will be even larger, probably on the order of $500 million.
4. The funding history of the MESA project supports
this view. The fiscal year 2003 omnibus appropriations bill provided
$113 million, an increase of $38 million above the request. The fiscal
year 2004 Energy and Water Development Appropriations Act, P.L. 108-137,
enacted December 1, 2003, provided $87 million for MESA, an increase
of $25.2 million above the request. These increases were almost certainly
done at the behest of the senior senator from New Mexico, Pete Domenici
(R), chairman of the appropriations energy and water subcommittee.
5. The first generation of ASCI machines deployed
from 1996-2000 had processing speeds ranging from roughly 1-10 teraOPS
(trillions of floating point operations per second); the current second
generation has speeds in the 10-100 teraOPS range; and the third generation,
starting in 2005, will have speeds of hundreds of teraOPS to petaOPS.
6. U.S. General Accounting Office, Problems
in the Management and Use of Supercomputers, GAO/T-RCED-99-257,
July 14, 1999.
7. NNSA 2005 CBR, p. 158 (Weapons Activities/Readiness
Campaign). See ibid., app. 20 (details of the Energy Departments
efforts in virtual prototyping and increased automation
of the nuclear weapons enterprise).
8. Tritium, a radioactive isotope of hydrogen,
is used to boost the fission reaction in the primary stage of nuclear
weapons, enabling the use of lesser amounts of plutonium and high
explosive and making the weapons more resistant to accidental nuclear
detonation. Tritium decays at the rate of 5.47 percent per year, so
the stockpile must ultimately be replenished when stockpile reductions
can no longer keep pace with the decline in the tritium inventory.
9. In 1989, nuclear weapons production at Rocky
Flats was abruptly halted because of serious environmental, safety,
and health problems at the plant. Operations at the plant and the
site contractor, Rockwell International, were the subject of an intensive
two-year federal grand jury investigation that began in 1989 after
FBI agents raided the plant. Rockwell, which had operated Rocky Flats
for more than a decade ending in 1989, later pled guilty to 10 environmental
crimes and paid an $18.5 million fine.
10. With gold priced at $405 an ounce.
Expensive Life Support for the U.S. Nuclear Arsenal
Extending the life of the current massive U.S. arsenal does not come
cheap. If the NNSA sticks to its present life extension
plans, over a seven-year period that will end in 2009, its direct
costs for maintaining and updating nuclear warheads will amount to
$11 billion, including $3.2 billion for 2,500-3,500 upgraded submarine-launched
ballistic missile warheads; almost $2 billion for 1,700-2,500 air-delivered
gravity bombs; $1.6 billion for 1,500-2,500 cruise missile warheads;
and $1.3 billion for up to 1,500 ICBM warheads. On the other hand,
it will spend only $235 million retiring and dismantling weapons.
Yet, that only scratches the surface. Looking at the next five years,
only a little more than one-quarter ($8.2 billion) of the $36 billion
that the Bush administration has proposed spending on the nuclear
weapons complex will go toward the actual work that is needed for
military commanders to be sure that their weapons are in working order.
These tasks, directed stockpile work, are spelled out
in the presidents annual Nuclear Weapons Stockpile Memorandum.
The rest of the five-year nuclear weapons budget, amounting to some
$27.5 billion, represents a 330 percent overhead charge
on top of the direct costs for the NNSAs deliverable
product: stockpiled nuclear warheads.
Tellingly, the largest single categoryalmost $8.6 billionin
the Bush administrations five-year, $36 billion spending plan
for nuclear weapons is not for actual programmatic work but for an
amorphous category called Readiness in Technology Base and Facilities.
According to the budget request, this spending is used to operate
and maintain a wide range of program infrastructure and facilities
in
a state of readiness, ensuring each capability (workforce and facility)
is operationally ready to execute programmatic tasks identified in
Campaigns and Directed Stockpile Work.
|
WEAPONS ACTIVITIES
|
FY 2005
|
FY 2006
|
FY 2007
|
FY 2008
|
FY 2009
|
TOTAL
|
| Directed Stockpile Work |
$1,406,435 |
$1,521,175 |
$1,648,144 |
$1,778,400 |
$1,812,398 |
$8,166,552 |
| Science Campaign |
$300,962 |
4301,382 |
$307,784 |
$328,330 |
$341,028 |
$1,579,486 |
| Engineering Campaign |
$242,984 |
$268,207 |
$226,357 |
$284,020 |
$236,838 |
$1,258,406 |
| Inertial Confinement Fusion & High
Yield Campaign |
$492,034 |
$521,319 |
$535,070 |
$437,069 |
$440,557 |
$2,426,049 |
| Advanced Simulation & Computing Campaign |
$741,260 |
$781,509 |
$825,705 |
$834,160 |
$848,359 |
$4,030,993 |
| Pit Manufacturing & Certification Campaign |
$336,473 |
$323,508 |
$314,180 |
$154,579 |
$158,168 |
$1,286,908 |
| Readiness Campaign |
$280,127 |
$330,801 |
$307,383 |
$357,027 |
$376,460 |
$1,651,798 |
| Readiness in Tech Base & Facilities |
$1,474,454 |
$1,600,185 |
$1,753,217 |
$1,839,266 |
$1,915,754 |
$8,582,876 |
| Secure Transportation |
$201,300 |
$185,000 |
$185,971 |
$190,014 |
$195,000 |
$957,285 |
| Nuclear Weapons Incident Response |
$99,209 |
$100,136 |
$100,657 |
$98,331 |
$100,609 |
$498,942 |
| Facilities Recapitalization |
$316,224 |
$372,707 |
$425,848 |
$472,114 |
$475,531 |
$2,062,424 |
| Safeguards and Security |
$706,991 |
$607,071 |
$618,684 |
$613,690 |
$626,298 |
$3,172,734 |
|
TOTAL
|
$6,598,453 |
$6,913,000 |
$7,249,000 |
$7,387,000 |
$7,527,000 |
$35,674,453 |
Christopher Paine is a Senior Nuclear Program Analyst
at the Natural Resources Defense Council.
|